Skip to main content

The builders start

After a summer of faffing we eventually commissioned Neville Francis to do the work on the roof that we got a quote for about five months ago.


So we’ve two builders (I’ve not met them, but Islay speaks highly of them) who are conducting various roof improvements.  The major job was to replace the lead work on the dormers, and judging from the incredibly rotten wood shards littering the lawn, not a moment too soon.  They’ve extended their work to pretty much rebuilding the dormers.  As I write the lead work is done and the windows await the render.


They’ve also done some nice neat leadwork above the porch, and coming up this week (weather permitting) they’ll be repairing slipped tiles, replacing the top courses on the chimney and adding some chimney pots.


It’s surprising how much the house is improved simply by tidying up the dormer windows, and I’m convinced that the inside of the dormer is less damp than it was before.  It’s also satisfying to have some serious work started now.  We’ve booked them in to do the insulation refurbishment in a month or so, and that’s the big and hairy job.

Comments

Popular posts from this blog

Boilers

We have a new boiler and a new water system. Woot. It is quiet.

Cables drop from the ceiling

Data, power and TV ready to be hooked up in the playroom

The time of maximum disruption

We’re three weeks in to the build so far and it’s thoroughly messy and chaotic at home.  There are some photos below that show some of the work that’s been done, but what the photos don’t convey well is that pretty much every room is in some sort of turmoil.  Photos also do not show up the relatively light (so far) layer of plaster dust that coats everything in the house. Anyway, here’s a belated catch up of the works. The first week saw a frenzy of progress.  In the space of two days floorboard came up, holes started appearing in walls, cables dropped from ceilings and an entirely new water tank appeared.  This was all very exciting.   We’ve had a pressurised water system fitted, which means that the top floor radiators are likely to see some hot action rather than lukewarm water.  However the pressure has also rendered our rubbish shower unusable.  We are reduced to bathing which is a time-consuming but opulent way of starting the day that gives me ...