Skip to main content

Interesting weekend coming up.



Tonight (Friday) I'm going out in Leicester with the lovely L (oh, and a group of her friends too). I don't think anything is going to happen - in an eminently predictable development in the context of my romantic life she's just started seeing someone else. Shame, as I reckon there's a bit of interest there, and a lot of interest from me.



And then tomorrow, I'm going out for dinner with her to talk about it. She thinks we're going out for a quick dinner in town, but I'm making one final, noble, doomed romantic gesture in an attempt to woo her and I've booked us in to a posh hotel and restaurant in Marlow for the night. The plan being something like "a similar ploy works in the movies".



Comments

Popular posts from this blog

Boilers

We have a new boiler and a new water system. Woot. It is quiet.

Cables drop from the ceiling

Data, power and TV ready to be hooked up in the playroom

The time of maximum disruption

We’re three weeks in to the build so far and it’s thoroughly messy and chaotic at home.  There are some photos below that show some of the work that’s been done, but what the photos don’t convey well is that pretty much every room is in some sort of turmoil.  Photos also do not show up the relatively light (so far) layer of plaster dust that coats everything in the house. Anyway, here’s a belated catch up of the works. The first week saw a frenzy of progress.  In the space of two days floorboard came up, holes started appearing in walls, cables dropped from ceilings and an entirely new water tank appeared.  This was all very exciting.   We’ve had a pressurised water system fitted, which means that the top floor radiators are likely to see some hot action rather than lukewarm water.  However the pressure has also rendered our rubbish shower unusable.  We are reduced to bathing which is a time-consuming but opulent way of starting the day that gives me ...